Scheme Kosh

Assistance to Co-operative Irrigation Societies M. N. R.-10 (General Area) — Gujarat

Quick answer

Assistance to Co-operative Irrigation Societies M. N. R.-10 (General Area) is a Gujarat scheme that helps a registered irrigation co-operative of farmers in a common area set up a shared lift-irrigation system; pumps, electric motors and a distribution network on a well or creek. Societies apply offline at the District Registrar's Office with a 10-year water permission order.

Benefit
Financial assistance to a registered farmers' irrigation co-operative for a shared pump, motor and water distribution system
Maximum benefit
Assistance is sanctioned against the technically approved project estimate; the department has not published a single fixed ceiling
Last date to apply
No fixed deadline announced — confirm the current year's window with the District Registrar's Office
How to apply
Offline at the District Registrar's Office (District Registrar, Co-operative Societies)
MinistryRegistrar of Co-operative Societies, Agriculture, Farmers Welfare and Co-operation Department, Government of Gujarat
BenefitFinancial assistance to a registered farmers' irrigation co-operative for a shared pump, motor and water distribution system
Maximum benefitAssistance is sanctioned against the technically approved project estimate; the department has not published a single fixed ceiling
Application modeOffline at the District Registrar's Office (District Registrar, Co-operative Societies)
Official websitehttps://mariyojana.gujarat.gov.in/

What is the M. N. R.-10 assistance to co-operative irrigation societies?

Assistance to Co-operative Irrigation Societies M. N. R.-10 (General Area) is a Gujarat state scheme run under the Agriculture, Farmers Welfare and Co-operation Department, with the Registrar of Co-operative Societies and the District Registrar's offices handling applications. "M. N. R.-10" is the departmental scheme code by which the co-operation wing identifies this particular irrigation-society assistance line, and "General Area" distinguishes it from the parallel components meant for Scheduled Caste and Scheduled Tribe societies.

The scheme's purpose, as stated on the scheme record, is to increase agricultural yield in the state by offering assistance to irrigation co-operative societies formed by farmers of a common area. The support goes into establishing water distribution systems using pumps and electric motors on wells and creeks.

The situation the scheme addresses is common across Gujarat. A group of farmers share a well, a check dam pond or a creek, but nobody among them can individually afford the pump set, the electric motor, the rising main and the buried pipeline network needed to move that water to a dozen scattered fields. Individually the investment makes no sense; collectively it does. M. N. R.-10 therefore works through the co-operative form: the farmers register a society, the society owns and runs the lift-irrigation system, and the state assists the society's project.

What the assisted system typically contains

  • A pump set and electric motor installed at the water source, a well or a creek.
  • A pump house or platform at the lifting point.
  • A rising main from the source to the highest point of the command area.
  • A gravity distribution network of pipes or channels reaching member fields.
  • Outlets and control valves at the field level.

Who is eligible for M. N. R.-10 assistance?

A society can apply if:

  • It is a registered co-operative irrigation society, formed by farmers of a common area.
  • Its members are small, marginal or other farmers whose land lies within the proposed command area.
  • The society is located within Gujarat.
  • It falls in the general category, which is the category this component covers.
  • It can obtain a feasibility certificate from the Irrigation Department for the proposed lifting point.
  • It holds or can obtain a water permission order valid for 10 years.
  • Its member landowners will give land consent on stamp paper for the pipeline alignment.

You are not eligible and cannot apply if:

  • You are an individual farmer. There is no individual benefit under M. N. R.-10; a farmer wanting a personal pump set or drip system should look at the individual irrigation and micro-irrigation schemes on the i-Khedut portal instead.
  • Your group is unregistered. An informal water-sharing group must first register as a co-operative society under the Gujarat Co-operative Societies Act.
  • The society is an SC or ST irrigation society, which is served by the separate parallel components rather than by the General Area component.
  • The Irrigation Department does not certify feasibility at the proposed lifting point, for example because the source cannot sustain the draw.
  • The society cannot secure a ten-year water permission order.
  • Landowners along the alignment withhold consent, leaving the distribution network without a legal route.

Because the benefit is a project grant rather than a personal entitlement, there is no individual income test, age limit or Aadhaar-seeding condition attached to the members. The tests applied are institutional: registration, feasibility, water rights and consent.

What documents does a society need for M. N. R.-10?

Document Mandatory Notes
Society registration certificate Yes Proves the applicant is a registered co-operative
Resolution accepting M. N. R.-10 terms Yes Passed by the society and signed by the authorised signatory
Member details with caste certificates Yes Establishes the category classification of the society
Survey of the village Yes Covers the proposed command area
Project plan and estimate with technical approval Yes Layout and costing for pump, motor and network
Feasibility certificate from the Irrigation Department Yes Confirms the lifting point is workable
Water permission order Yes Must be for a 10-year duration
Land consent agreements Yes On stamp paper of Rs 300, from affected landowners
8-A extracts of members Yes Revenue record of members' landholding

The 8-A extract is the Gujarat revenue record that lists all survey numbers held by a person in a village, and it is what the department uses to confirm that the members whose land the scheme will irrigate actually hold that land.

How to apply for M. N. R.-10 assistance

  1. Register the irrigation society under the Gujarat Co-operative Societies Act if it is not already registered, and pass a general body resolution accepting the terms of M. N. R.-10.
  2. Obtain the technical inputs. A feasibility certificate from the Irrigation Department for the lifting point, and a project plan and cost estimate with technical approval for the pump, motor and distribution network.
  3. Secure the water permission order for the source, valid for ten years, and collect land consent agreements from affected landowners on stamp paper of Rs 300.
  4. Visit the District Registrar's Office and collect the M. N. R.-10 application form along with the current checklist.
  5. Fill the form completely with the society's registration particulars, member list with caste certificates, village survey details and the estimate, and attach self-attested copies of every document.
  6. Submit the completed application at the District Registrar's Office and ask for a receipt or acknowledgement carrying an inward number and date.
  7. Cooperate with the field verification. Officers inspect the source, the proposed alignment and the command area before the file moves for sanction.

There is no online application for this scheme. The Gujarat co-operation department's scheme directory at mariyojana.gujarat.gov.in publishes the scheme's guidelines, and the District Registrar's Office is the single point of contact for the form, the checklist and the file.

How do you follow up on an M. N. R.-10 application?

  1. Keep the acknowledgement with the inward number issued at submission; it is the only reference the office works from.
  2. Visit or telephone the District Registrar's Office and quote the inward number to learn the current stage — scrutiny, technical check, field inspection or sanction.
  3. When a query is raised, supply the specific document asked for in writing and take a fresh acknowledgement for the reply.
  4. After sanction, track the release of instalments against work completed, since project assistance is normally released stage-wise rather than in one payment.

Why M. N. R.-10 proposals get held up

  • Water permission order short of ten years, or still pending with the water resources authority.
  • Feasibility certificate not obtained, which stops the file before costing is even examined.
  • Estimate without technical approval, or an estimate that does not match the layout submitted.
  • Incomplete land consents. One landowner on the alignment refusing consent is enough to stall the whole distribution network.
  • Society records not in order, audit dues pending, elections overdue, or a resolution signed by someone not authorised.
  • 8-A extracts that do not match the member list, usually because land has changed hands and the record was never updated.

Most of these are curable, but they are curable only before submission. A society that assembles the water permission, the feasibility certificate and the consents first, and applies afterwards, moves through scrutiny far faster than one that files an incomplete set and answers queries one at a time.

Where do you raise a grievance about M. N. R.-10?

  • First level: the District Registrar, Co-operative Societies, for your district, who holds the file.
  • Second level: the Registrar of Co-operative Societies, Gujarat State, Gandhinagar, under the Agriculture, Farmers Welfare and Co-operation Department.
  • Scheme text and guidelines: the state scheme directory at mariyojana.gujarat.gov.in.

No fee is payable to apply beyond the ordinary cost of stamp paper and copies of revenue records. Because the sanctioned amount depends on the technically approved estimate for each society's own project, a society should ask the District Registrar's Office for the current year's assistance pattern in writing rather than rely on a figure quoted informally.

Documents required

Registration certificate of the co-operative irrigation society
The applicant must be a society registered under the Gujarat Co-operative Societies Act, not a group of individual farmers.
Resolution accepting the terms of M. N. R.-10
A general body or managing committee resolution recording that the society accepts the scheme conditions.
Member list with caste certificates
Details of members, with caste certificates, so the category classification of the society can be established.
Survey of the village
Village survey particulars covering the command area proposed to be irrigated.
Project plan and estimate with technical approval
Layout and cost estimate for the pump, motor, rising main and distribution network, technically approved by the competent authority.
Feasibility certificate from the Irrigation Department
Confirms that lifting water at the proposed point is technically feasible.
Water permission order valid for 10 years
Permission to draw water from the source, granted for a ten-year duration.
Land consent agreements on stamp paper
Consent of landowners for laying the pipeline or channel, executed on stamp paper of Rs 300.
8-A land extracts of members
Revenue record extracts establishing the landholding of the member farmers in the command area.

Frequently asked questions

Who can apply for assistance under M. N. R.-10?

A registered co-operative irrigation society formed by small, marginal or other farmers of a common area in Gujarat can apply. Individual farmers cannot apply; the assistance is sanctioned to the society as a body.

What does the M. N. R.-10 scheme pay for?

The scheme funds a shared lift-irrigation system — pumps and electric motors installed on a well or creek together with the water distribution network that carries the water to members' fields.

Is M. N. R.-10 open to all categories of farmers?

This particular variant is the General Area component and applies to the general category. Scheduled Caste and Scheduled Tribe irrigation societies are covered under separate parallel components of the co-operation department's irrigation society schemes.

How is the application made?

The application is made offline. The society collects the form from the District Registrar's Office, fills it, attaches self-attested documents and submits it back at the same office against a receipt.

Why is a 10-year water permission order needed?

The scheme funds fixed infrastructure — a pump house, rising main and buried distribution network — that has no value if the right to draw water lapses in a year or two, so a ten-year water permission order is a condition of sanction.

What is the land consent agreement for?

The distribution network usually crosses the fields of several members, so each affected landowner must give written consent on stamp paper of Rs 300 before the alignment is approved.

How much assistance does the scheme give?

Assistance is sanctioned against the technically approved project estimate for the society's scheme. The department has not published a single fixed per-society ceiling, so the sanctioned amount should be confirmed with the District Registrar's Office for the current year.

More from the Registrar of Co-operative Societies, Agriculture, Farmers Welfare and Co-operation Department, Government of Gujarat

Didn't find what you needed?

Browse every central scheme by category, or search by name.

Written by Aapt Dubey, Author

Fact-checked by Rishu Dubey

Last fact-checked: 2 August 2026