Scheme of Assistance for Common Environment Infrastructure: Scheme of Assistance for Strengthening the Regulation and Environmental Compliance
The Scheme of Assistance for Strengthening the Regulation and Environmental Compliance gives need-based support of up to Rs 50,00,000 per project to IITs, NITs, state engineering colleges, R&D institutions, GPCB, GEMI and GCPC for cleaner-production research, environment monitoring, training centres and environment clinics in Gujarat. Institutions apply to the Industries Commissionerate.
| Ministry | Industries and Mines Department, Government of Gujarat (Industries Commissionerate, with the Gujarat Pollution Control Board) |
|---|---|
| Benefit | Need-based assistance of up to Rs 50 lakh per project, decided by the State Level Empowered Committee |
| Maximum benefit | Rs 50,00,000 per project |
| Application mode | Offline — detailed project report and prescribed application form to the Industries Commissionerate, Gandhinagar |
| Helpline | +91 79 23252619, +91 79 23252689, +91 79 23252682 |
| Official website | https://ic.gujarat.gov.in/assistance-for-common-environmental-infrastructure.aspx |
What is the Scheme of Assistance for Strengthening the Regulation and Environmental Compliance?
The Scheme of Assistance for Strengthening the Regulation and Environmental Compliance is one component inside Gujarat's Scheme of Assistance for Common Environment Infrastructure, notified by the Industries and Mines Department through Government Resolution No. GID/102020/326692/G dated 1 September 2020 under the Gujarat Industrial Policy 2020. The resolution brought the scheme into force from 7 August 2020 for five years, up to 6 August 2025, replacing the earlier Common Environment Infrastructure scheme of 19 January 2015.
The component is different in kind from the rest of the package. The other components of the Common Environment Infrastructure resolution pay for physical plant, common effluent treatment facilities, a common boiler set up by a special purpose vehicle of at least ten MSMEs, and the Green Estate component that funds relocating polluting units into a purpose-built estate. This component instead funds the capability around regulation: the research, the monitoring systems, the trained operators and the advisory clinics without which environmental rules exist only on paper.
According to the scheme listing for the component, assistance is need-based, up to a maximum of Rs 50,00,000 per project, subject to approval by the State Level supported Committee (SLEC). There is no published percentage rate, because each proposal is costed on its own merits and sanctioned at what the committee accepts.
What projects does the scheme fund?
The component supports work of five broad kinds:
- Research and pilot projects on cleaner production technology, carried out through institutions such as IITs, NITs and the science and engineering colleges of the State. The intent is to prove a cleaner process at pilot scale before industry is asked to adopt it.
- Environment monitoring, including real-time monitoring infrastructure that produces continuous data on emissions and effluent rather than periodic samples.
- Environmental impact assessment and pollution-control initiatives, where a study or an intervention benefits a cluster or a region rather than one unit.
- Capacity building and skill development for industry professionals, plus training centres for operators and instructors. Effluent plants in Gujarat fail far more often for want of a trained operator than for want of equipment.
- Environment clinics, which the scheme describes as a collaborative platform where industry representatives and environmental experts sit together on practical compliance problems.
This is why the eligible applicant list is a list of institutions. A cleaner production pilot or a training centre is something a college, a research body or a regulator builds; not a benefit any single business claims.
Who is eligible, and who is not eligible?
Institutions that can apply:
- IITs and NITs.
- Science and engineering colleges of the State of Gujarat.
- Scientific and research and development institutions.
- Gujarat Pollution Control Board (GPCB), Gujarat Environment Management Institute (GEMI) and the Gujarat Cleaner Production Centre (GCPC).
The wider Common Environment Infrastructure resolution defines an eligible institution more broadly for its other components, an industries association, an enterprise other than for captive use, a firm registered under the Societies Act, Trust Act or Companies Act, or GIDC, a board, corporation, SPV, PSU, municipal corporation, nagarpalika or urban development authority. For this particular component the emphasis is squarely on scientific, academic and regulatory institutions.
Who cannot apply:
- Individuals. There is no personal benefit under this scheme, no payment to a citizen and no application form for a person. Any offer to arrange a personal grant under it should be treated as fraudulent.
- A single enterprise seeking to fund its own compliance. Effluent plant, scrubbers or monitoring equipment for one factory's own use are not what this component pays for.
- Enterprises operating a facility for captive use, which the parent resolution excludes from the definition of an eligible institution.
- Projects already drawing another State Government incentive for the same component. Simultaneous claims from two state schemes for the same item are not allowed, although Government of India or institutional support remains available.
- Proposals filed after the project has been implemented. The scheme is designed to be applied for before implementation.
What documents does a proposal need?
| Document | Mandatory | Notes |
|---|---|---|
| Detailed project report | Yes | Scope, methodology, deliverables and a costed budget |
| Application in the prescribed proforma | Yes | Filed before the project is implemented |
| Legal status documents of the institution | Yes | MoA and AoA, trust deed, society registration or constituting order |
| GPCB NOC or CCA, or justification | Yes | Justification accepted where the project has no regulated facility |
| Environmental Clearance, or justification | If applicable | Only where the EIA notification applies |
| Process diagram, signed | If applicable | For treatment, laboratory or monitoring processes |
| Financial and technical appraisal | Yes | From a bank, financial institution or approved appraising institution |
| Details of other assistance received | Yes | Prevents a double claim under another state scheme |
| Affidavit on dues and litigation | Yes | Pending government dues and court cases |
How to apply for assistance under this scheme
- Define the project and prepare a detailed project report. State clearly which of the eligible activities it falls under, cleaner production research, monitoring, EIA and pollution control, capacity building, a training centre or an environment clinic, and cost it line by line.
- Obtain the appraisal. A financial and technical appraisal from a bank, financial institution or an approved appraising institution is what the committee treats as the project cost, not the institution's own estimate.
- Assemble the statutory papers — legal status documents, GPCB NOC or CCA or a written justification, Environmental Clearance where applicable, process diagrams, the affidavit on pending dues and litigation, and the declaration on assistance received from other sources.
- File the application in the prescribed proforma with the Industries Commissionerate, Udyog Bhavan, Sector 11, Gandhinagar 382017, before the project is implemented, and collect the dated acknowledgement.
- Present the proposal to the screening committee chaired by the Industries Commissioner, which scrutinises applications under this resolution and recommends them onward.
- Await the State Level supported Committee decision. SLEC, chaired by the Additional Chief Secretary or Principal Secretary of the Industries and Mines Department, fixes the need-based amount within the Rs 50 lakh ceiling.
- Implement the project and file claims with verified expenditure documentation, as assistance is released against actual spending and, for the sibling infrastructure components, only after a project completion certificate.
How is the assistance released?
Assistance under the Common Environment Infrastructure resolution is released against verified expenditure rather than as an upfront lump sum, and the Industries Commissionerate publishes an indicative service timeline for the sibling common environmental infrastructure component: the application goes to the Industries Commissionerate office and the District Industries Centre before implementation, is reviewed within about 60 days with a presentation if required, the decision is conveyed within roughly 8 days of State Level Committee approval, and payment follows within about 15 days of the claim being found in order. Proposals under this component pass through the same offices.
The institution must also furnish an undertaking about pending government dues and pending court cases against Government, boards and corporations. Detailed guidelines for the components are issued separately by the Industries Commissionerate, and a prospective applicant should ask for the current version before drafting the DPR.
Common reasons proposals fail
- Applicant is not an eligible institution, or is an enterprise seeking captive-use funding.
- Application filed after implementation began, which the scheme does not permit.
- Unappraised project cost; only an appraised figure is worked on.
- Duplicate state assistance for the same component.
- Missing GPCB documentation with no written justification for its absence.
- Undisclosed government dues or litigation in the affidavit.
- Vague deliverables. A need-based grant is sanctioned against a defined output. A pilot report, a monitoring system commissioned, a number of operators trained, not against a general intention.
Where to get help
- Industries Commissionerate, Udyog Bhavan, Sector 11, Gandhinagar 382017 to +91 79 23252619, +91 79 23252689, +91 79 23252682.
- Gujarat Pollution Control Board, for the regulatory view on a proposal and for NOC or CCA documentation.
- Gujarat Cleaner Production Centre and GEMI, both eligible applicants and usual technical partners for cleaner-production work.
- Investor Facilitation Portal, ifp.gujarat.gov.in, which hosts the text of the Gujarat Industrial Policy 2020 scheme resolutions.
This is an institutional scheme. No individual receives money under it, and the operative period published in the 2020 resolution has run its five years, so the first call an institution should make is to the Industries Commissionerate to confirm whether a successor resolution is in force.
Documents required
Frequently asked questions
How much assistance does this scheme give?
The scheme gives need-based financial assistance of up to Rs 50,00,000 per project, with the actual amount decided by the State Level Empowered Committee. It is not a fixed grant and no percentage rate is published for the component.
Can an individual or a single factory apply?
No. Individuals cannot apply and there is no personal benefit. Eligible applicants are institutions — IITs, NITs, science and engineering colleges of the State, scientific and R&D institutions, and GPCB, GEMI or GCPC.
What kind of projects are funded?
Research and pilot projects on cleaner production technology, environment monitoring including real-time monitoring systems, environmental impact assessment and pollution-control initiatives, capacity building and skill development for industry professionals, training centres for operators and instructors, and environment clinics where industry and environmental experts work on common problems.
Who approves the assistance?
The State Level Empowered Committee approves projects under this component, after the proposal is scrutinised by the Industries Commissionerate. The SLEC is chaired by the Additional Chief Secretary or Principal Secretary of the Industries and Mines Department.
Can the same project also take assistance from another state scheme?
No. A project cannot claim incentives for the same component under this scheme and another State Government scheme at the same time, though Government of India or institutional schemes remain available.
Is the scheme still open?
The parent Scheme of Assistance for Common Environment Infrastructure was notified for 7 August 2020 to 6 August 2025 under the Gujarat Industrial Policy 2020. Institutions should confirm the current status and any successor resolution with the Industries Commissionerate before preparing a proposal.
Where is the application filed?
Offline, with the Industries Commissionerate at Udyog Bhavan, Sector 11, Gandhinagar, in the prescribed proforma with the detailed project report, before the project is implemented.
Didn't find what you needed?
Browse every central scheme by category, or search by name.