Scheme Kosh

National Mission on Edible Oil — Oil Palm: Custom Hiring Centre cum Harvester Groups (Gujarat)

Quick answer

Custom Hiring Centre cum Harvester Groups under the National Mission on Edible Oil, Oil Palm gives Gujarat oil palm growers up to Rs 25,00,000 per unit for harvesting equipment, tools, training, contingencies and maintenance. Centres are set up by processors, state agencies, SHGs, FPOs or registered societies, and applications are filed free on the i-Khedut portal.

Benefit
Up to Rs 25 lakh per unit for oil palm harvesting equipment, tools, training, contingencies and maintenance
Maximum benefit
Rs 25,00,000 per Custom Hiring Centre cum Harvester Group unit
Last date to apply
No fixed last date announced — i-Khedut opens component-wise application windows during the financial year against the state's NMEO-OP allocation
How to apply
Online on the i-Khedut portal (ikhedut.gujarat.gov.in)
MinistryDirectorate of Horticulture, Agriculture, Farmers Welfare and Co-operation Department, Government of Gujarat
BenefitUp to Rs 25 lakh per unit for oil palm harvesting equipment, tools, training, contingencies and maintenance
Maximum benefitRs 25,00,000 per Custom Hiring Centre cum Harvester Group unit
Application modeOnline on the i-Khedut portal (ikhedut.gujarat.gov.in)
Official websitehttps://ikhedut.gujarat.gov.in/

What is the Custom Hiring Centre cum Harvester Groups component?

Custom Hiring Centre cum Harvester Groups is a component of the National Mission on Edible Oil: Oil Palm (NMEO-OP), a Centrally Sponsored Scheme of the Government of India that Gujarat implements through the Agriculture, Farmers Welfare and Co-operation Department and its Directorate of Horticulture. The component pays for the machinery and tools needed to harvest oil palm, held collectively at a centre that hires them out to growers.

The overall mission exists to raise domestic edible oil production and cut India's dependence on imported edible oil. Oil palm yields far more oil per hectare than any other oilseed crop, which is why the mission pushes its area expansion. Gujarat has been among the states bringing new area under oil palm, and this component addresses what happens after the trees start bearing.

Harvesting is oil palm's hardest practical problem. A fresh fruit bunch grows high on the trunk, weighs between roughly 10 and 25 kilograms, and has to be cut within a narrow ripeness window and delivered to a mill within about 24 hours or the oil quality falls. Cutting it needs chisels and sickles on long telescopic poles, and on taller palms mechanised harvesters. A smallholder with two or three hectares cannot justify buying that kit, and it sits idle most of the year anyway. A custom hiring centre buys it once and rents it out across many growers, which is exactly the gap this component fills.

What the assistance covers

  • Harvesting equipment for oil palm fruit bunches.
  • Hand tools such as chisels, sickles and telescopic poles.
  • Training for the harvester group in safe and correct harvesting.
  • Contingencies associated with setting up the unit.
  • Maintenance of the equipment held at the centre.

How much assistance does the component provide?

The component provides Rs 25,00,000 per unit for equipment, tools, training, contingencies and maintenance. That figure is a per-unit ceiling for the centre, not a payment to an individual grower.

Two things follow from the ceiling. First, the admissible amount is worked out against quotations or the approved price list for the equipment proposed, so a proposal costing less than Rs 25 lakh is sanctioned at its own cost, not at the ceiling. Second, because the assistance covers training, contingencies and maintenance alongside the machines themselves, a proposal that budgets only for machines and nothing for upkeep tends to come back with queries, a harvester without a maintenance line stops working within a season or two.

The number of units sanctioned in Gujarat in any year is limited by the state's annual allocation under NMEO-OP, which is why i-Khedut opens the component for a defined window rather than leaving it open permanently.

Who is eligible for the Custom Hiring Centre cum Harvester Groups component?

You can apply if:

  • You are a processor, state entity, self-help group (SHG), farmer producer organisation (FPO) or registered society, these are the categories the scheme names as the bodies that will create custom hiring centres.
  • You are resident in Gujarat and the centre will serve oil palm growers in the state.
  • You are connected to oil palm cultivation, either as a grower body or as a processor with a grower base.
  • You hold a bank account in the name of the applying entity and can produce Aadhaar for the authorised signatory.
  • You can produce land records 7/12 and 8-A for the holding concerned.

You are not eligible and cannot apply if:

  • You are an individual farmer seeking a personal grant of Rs 25 lakh. The unit is an institutional asset meant to be hired out; an individual grower benefits by hiring the equipment, not by receiving the unit cost.
  • Your crop is not oil palm. Growers of other oilseeds are covered by different missions and different components.
  • You are outside Gujarat. Each state implements NMEO-OP through its own portal and its own allocation.
  • Your institution is unregistered, since a registration certificate is part of the document set.
  • You apply outside the component window opened on i-Khedut for the year.

There is no income ceiling and no age bar published for this component. What is tested is the institutional form, the link to oil palm, and the credibility of the equipment proposal.

What documents are required?

Document Mandatory Notes
Aadhaar card Yes Of the applicant or authorised signatory
Land record 7/12 and 8-A Yes Revenue records for the oil palm holding
Bank passbook or cancelled cheque Yes Account of the applicant or institution
Registration certificate of the SHG, FPO, society or company Yes Establishes the institutional applicant
Quotations or price list for equipment Yes Basis for computing admissible cost
Caste certificate No Only where a reserved-category component is claimed
Details of growers to be served No Supports the case for the centre's location

How to apply for the Custom Hiring Centre cum Harvester Groups component

  1. Open the i-Khedut portal at ikhedut.gujarat.gov.in and complete beneficiary registration, choosing the correct applicant type, farmer, institution or other.
  2. Enter district, taluka, village, bank account details and, for an institution, its registered name; verify the OTP sent to your mobile number and set a password.
  3. Log in and open Agricultural Schemes, then locate the National Mission on Edible Oil — Oil Palm scheme and the Custom Hiring Centre cum Harvester Groups component.
  4. Click Apply New and fill the application with the applicant's details, the oil palm area to be served, the equipment proposed and its estimated cost.
  5. Upload the documents, Aadhaar, 7/12 and 8-A, bank passbook or cancelled cheque, registration certificate and equipment quotations.
  6. Confirm the application. An application that is saved but not confirmed is never taken up for processing.
  7. Print the confirmed application, sign it, attach self-attested copies of the documents and submit it to the district horticulture office when called for, keeping the acknowledgement.

Applying is free. A grower body without internet access can complete the same steps at a Village Computer Entrepreneur point, an e-Gram centre or a Common Service Centre.

How do you check the status of the application?

  1. Log in again at ikhedut.gujarat.gov.in with your registered mobile number and password.
  2. Open the application status option and enter the application number from your printed acknowledgement.
  3. Read the stage, confirmed, verified at district level, pre-approval granted, or rejected.
  4. Wait for pre-approval before purchasing equipment. Buying machines before the sanction is issued is a common and expensive mistake, because bills dated before approval are usually not admitted.
  5. After purchase, submit bills, payment proof and installation evidence for the physical verification that precedes release.

Why applications under this component get rejected

  • Application saved but never confirmed on i-Khedut.
  • Individual applicant where the component requires a processor, state agency, SHG, FPO or registered society.
  • No demonstrable oil palm base, no growers, no area, no processor tie-up.
  • Equipment purchased before pre-approval, so the bills fall outside the sanction period.
  • Quotations missing or inconsistent with the equipment list.
  • Bank account in a personal name rather than in the institution's name.
  • Window closed for the component in that financial year.

Where do you raise a grievance?

  • First level: the district horticulture officer or the Assistant Director of Horticulture for your district, who verifies the application.
  • Second level: the Director of Horticulture, Agriculture, Farmers Welfare and Co-operation Department, Gandhinagar, through agri.gujarat.gov.in.
  • Portal problems: the contact option published on ikhedut.gujarat.gov.in.

Because NMEO-OP is a Centrally Sponsored Scheme whose component norms and state allocations are revised from time to time, an applicant should confirm the current year's unit cost and sharing pattern with the district horticulture office before committing to a purchase, and should never pay an agent for a sanction that costs nothing to apply for.

Documents required

Aadhaar card
Identity proof of the applicant or the authorised signatory of the institution.
Land record 7/12 and 8-A
Revenue records establishing the oil palm holding and the land on which the centre will operate.
Bank passbook or cancelled cheque
Assistance is credited to the applicant's or the institution's own bank account.
Caste certificateoptional
Required only where the applicant claims benefit under a reserved category component.
Registration certificate of the SHG, FPO, society or processor company
Needed for every institutional applicant, since the centre is set up by an institution rather than an individual.
Quotations or price list for the harvesting equipment and tools
Used to compute the admissible cost of the unit against the Rs 25 lakh ceiling.
Details of the oil palm growers to be servedoptional
Establishes the area and the number of growers that the custom hiring centre will cover.

Frequently asked questions

How much assistance is given for a Custom Hiring Centre cum Harvester Group?

The scheme provides Rs 25,00,000 per unit, covering equipment, tools, training, contingencies and maintenance for oil palm harvesting. The amount is a per-unit ceiling, not a per-farmer payment.

Who sets up a Custom Hiring Centre under NMEO-Oil Palm?

Custom Hiring Centres are created by processors, state entities, self-help groups, farmer producer organisations or registered societies. An individual grower does not set up a centre; growers use it for harvesting on hire.

Can an individual farmer apply for the Rs 25 lakh?

An individual grower is not the intended recipient of the unit grant, which is meant for the institution that will operate the centre and hire out equipment. Individual oil palm growers should instead use the planting material, maintenance and intercropping components of NMEO-OP.

Why does oil palm need special harvesting equipment?

Oil palm fruit bunches grow high on the trunk and weigh 10 to 25 kilograms each, so cutting and lowering them needs poles, chisels, sickles on telescopic poles and mechanical harvesters that no single smallholder can justify buying.

Where does a Gujarat applicant apply?

Applications are filed online on the i-Khedut portal at ikhedut.gujarat.gov.in under Agricultural Schemes, and there is no fee for applying.

What documents are needed?

Aadhaar card, land records 7/12 and 8-A, a bank passbook or cancelled cheque, and a caste certificate where applicable, along with the registration certificate of the applying institution.

Is NMEO-Oil Palm a central or a state scheme?

NMEO-Oil Palm is a Centrally Sponsored Scheme of the Government of India, implemented in Gujarat by the state's Agriculture, Farmers Welfare and Co-operation Department through the i-Khedut portal.

More from the Directorate of Horticulture, Agriculture, Farmers Welfare and Co-operation Department, Government of Gujarat

Didn't find what you needed?

Browse every central scheme by category, or search by name.

Written by Aapt Dubey, Author

Fact-checked by Rishu Dubey

Last fact-checked: 2 August 2026