Saur Sujala Yojana gives Chhattisgarh farmers solar irrigation pump sets of 2 HP, 3 HP and 5 HP at a subsidy of roughly 90 to 95 per cent of cost, run by CREDA under the Energy Department. Farmers with an existing well, borewell or water source apply at the district CREDA office; the pump is installed and maintained by CREDA.

Benefit
Solar irrigation pump of 2 HP, 3 HP or 5 HP at about 90-95 per cent subsidy
Maximum benefit
Up to Rs 2 lakh per plant (CREDA subsidy ceiling of Rs 50 per watt for solar irrigation pumps)
Last date to apply
Open all year — applications accepted against annual district targets, so demand is met on a first-come, first-served basis
How to apply
Offline — application form submitted at the district CREDA office

What is Saur Sujala Yojana?

Saur Sujala Yojana is a Chhattisgarh state scheme that installs solar-powered irrigation pump sets on farmers' fields at a heavily subsidised price. The scheme is implemented by the Chhattisgarh State Renewable Energy Development Agency (CREDA) under the state Energy Department, and it has been running since 2016-17.

The problem the scheme answers is specific to Chhattisgarh. Large parts of the state: particularly the forest belts of Bastar, Surguja and the northern districts, have fields far from a reliable eleven-kilovolt line. Extending grid power to a scattered five-acre holding costs the state more than the farmer will ever pay in tariff. A standalone solar pump removes the grid from the equation altogether: panels on the field, a submersible or surface pump, and water when the sun is up.

According to CREDA, the scheme supplies pumps in three sizes, 2 HP, 3 HP and 5 HP, with the state and central subsidy together covering roughly 90 to 95 per cent of the system cost. The farmer contributes only the remaining share. The scheme's name, sometimes written "Saur Sujla Yojana", combines saur (solar) with sujala, meaning well-watered.

Main features

  • Standalone solar photovoltaic pumping systems with no grid connection.
  • Three capacities to 2 HP, 3 HP and 5 HP: assigned by technical survey.
  • Subsidy of about 90-95 per cent of system cost; CREDA's published ceiling for solar irrigation pumps up to 5 HP is Rs 50 per watt or a maximum of Rs 2 lakh per plant.
  • Installation, commissioning and warranty-period maintenance handled by CREDA through empanelled suppliers.
  • No monthly electricity bill for pump operation.

Who is eligible for Saur Sujala Yojana?

You can apply if:

  • You are a resident of Chhattisgarh and cultivate land within the state.
  • You own the land where the pump will be installed, or hold a lawful cultivation right recorded in the revenue papers.
  • Your field already has a working water source. A borewell, dug well, farm pond, nala or other accessible water body.
  • Your holding has no assured grid electricity supply for irrigation, or grid extension is not feasible. This is the strongest priority category.
  • You can pay the beneficiary contribution for the pump size sanctioned.

Small, medium and large farmers are all covered. CREDA's subsidy schedule also allows solar pumping systems for community organisations and government institutions, not only individual farmers.

You cannot apply if:

  • Your field has no water source yet. Saur Sujala Yojana supplies the pump only; drilling a borewell or digging a well is not part of the scheme.
  • You are not a Chhattisgarh resident or the land lies outside the state.
  • You have already received a subsidised solar pump under Saur Sujala Yojana or PM-KUSUM for the same holding. One pump per eligible field is the norm.
  • You cannot produce a land record linking you to the field. Informal or disputed occupation without any revenue entry is not eligible.
  • Your water source fails the technical survey, for example a borewell whose yield or depth cannot support the pump size applied for.

Priority within the annual district target usually goes to scheduled caste and scheduled tribe farmers, small and marginal holdings, and fields in non-electrified pockets.

What documents do you need?

Document Mandatory Notes
Aadhaar card Yes Identity; name must match the bank account
Land record (khasra / B-1 / P-II) Yes Proves ownership or cultivation right over the field
Proof of water source Yes Borewell, well or water body; physically inspected by CREDA
Bank account passbook Yes For the beneficiary record and refunds
Passport-size photograph Yes Attached to the application form
Mobile number Yes For survey and installation updates
Caste certificate No Only for SC/ST priority category claims

How to apply for Saur Sujala Yojana

Saur Sujala Yojana is an offline scheme. Applications are received and processed at the district CREDA office, not through a self-service web portal.

  1. Collect the application form. Get the Saur Sujala Yojana form from your district CREDA office, or download it from the CREDA website at creda.co.in. District administration websites also host the form.
  2. Fill in the form completely; your name as it appears on Aadhaar, village and tehsil, khasra number of the field, the type and depth of your water source, the area you irrigate, and the pump capacity you are seeking.
  3. Attach the documents — self-attested copies of your Aadhaar card, land record, bank passbook, caste certificate if you are claiming a priority category, and a passport-size photograph.
  4. Submit the file at the district CREDA office and collect a dated acknowledgement with your application number. Keep this; every follow-up runs on that number.
  5. Allow the technical survey. A CREDA engineer visits your field to check the water source, measure the static water level and yield, and confirm the pump size that suits the site. Be present, or send someone who can show the field boundaries.
  6. Pay the beneficiary contribution once your application is sanctioned. The amount depends on the pump size and the subsidy applicable in that year's sanction. Pay only against a formal demand letter and keep the receipt.
  7. Installation and commissioning. The empanelled supplier erects the panel array, installs the pump and hands over the system. Sign the commissioning certificate only after you have seen water delivered.

How to check your application status

  1. Quote your application number at the district CREDA office. The status of survey, sanction and installation is tracked there.
  2. Ask the CREDA district in-charge whether your case has been included in the current year's district target. Applications beyond the annual target are carried to the next year rather than rejected.
  3. After installation, keep the commissioning certificate and warranty document. Any later service claim runs on these papers.
  4. For a system that has stopped working, report to the district CREDA office in writing; CREDA routes the complaint to the supplier under the maintenance contract.

Why applications get rejected or delayed

  • No functioning water source at the time of survey, the single most common ground for rejection.
  • Water source too weak for the pump size applied for; CREDA may sanction a smaller pump instead of the one requested.
  • Land record does not match the applicant's name, often because a family holding was never mutated after a death.
  • District target exhausted for the year. This is a delay, not a rejection. The application stays in the queue.
  • Beneficiary contribution not paid within the period given in the demand letter, after which the sanction lapses.
  • Duplicate benefit. A solar pump already sanctioned for the same field under PM-KUSUM or an earlier Saur Sujala sanction.

If your land record is the problem, apply for mutation at the tehsil office and resubmit. If the survey found your borewell too weak, deepening it and asking for a re-survey is the usual route.

What the farmer actually pays and saves

The farmer's share is the balance after subsidy, roughly 5 to 10 per cent of the system cost, depending on the pump size and the year's sanction terms. Against that one-time contribution, a Saur Sujala pump removes two recurring costs: diesel for a pump set, and the electricity bill on a grid connection. It also removes the dependence on supply hours, since the pump runs whenever there is sun, which matters most during the rabi irrigation window.

Chhattisgarh separately subsidises grid-connected agricultural pumps through the Krishak Jeevan Jyoti Yojana. A farmer who already has a reliable grid connection and free or subsidised units under that scheme should compare the two before applying, since a solar pump is most valuable exactly where the grid is not.

Help and grievance redressal

  • CREDA head office, Raipur; Chhattisgarh State Renewable Energy Development Agency, Raipur. Contact details are published on creda.co.in; CREDA does not advertise a single toll-free farmer helpline for this scheme.
  • District CREDA office. The first point of contact for application status, survey scheduling, sanction and repairs.
  • District Collector's Jan Chaupai / grievance cell, for complaints that the CREDA office does not resolve.
  • Chhattisgarh state grievance portal, for written complaints with an auditable trail.

Application under Saur Sujala Yojana is free. No agent can charge a fee to "get your pump sanctioned", and the only money a beneficiary pays is the official contribution demanded in writing by CREDA against a receipt.

Documents required

Aadhaar card
Used for identity and to seed the beneficiary record; must match the bank account name.
Land record (khasra / B-1 / P-II)
Proves the applicant owns or lawfully cultivates the field where the pump is to be installed.
Proof of a water source
An existing borewell, dug well, farm pond or other accessible water body. CREDA staff inspect it before sanction.
Bank account passbook
Required for the beneficiary record and any refund of the contribution.
Caste certificateoptional
Needed only if you are claiming under an SC or ST priority category.
Passport-size photograph
Attached to the application form filed at the district CREDA office.
Mobile number
Used for survey scheduling and installation updates.

Frequently asked questions

How much subsidy does Saur Sujala Yojana give?

Saur Sujala Yojana covers roughly 90 to 95 per cent of the cost of a solar irrigation pump, and the farmer pays only the balance contribution. CREDA's published subsidy norm for solar irrigation pumping systems up to 5 HP is Rs 50 per watt, subject to a maximum of Rs 2 lakh per plant.

What pump sizes are available under Saur Sujala Yojana?

Three sizes are offered — 2 HP, 3 HP and 5 HP. The size sanctioned depends on the depth and yield of your water source and the area you irrigate, and CREDA's technical survey decides it, not the applicant.

Who can apply for Saur Sujala Yojana?

Any farmer resident in Chhattisgarh who cultivates land in the state and already has a working water source such as a borewell, dug well or farm pond. Small, medium and large farmers are all covered, with priority for fields that have no assured grid power.

Can I apply if my field has no well or borewell yet?

No. Saur Sujala Yojana supplies the pump, not the water source. CREDA's technical team physically inspects the well or water body before approving installation, so the source must already exist and yield water.

Where do I submit the Saur Sujala Yojana application?

At your district CREDA office. The application form is available at the district office and on the CREDA website, and it is submitted offline with your land record, Aadhaar, bank passbook and photograph.

Who maintains the solar pump after installation?

CREDA arranges maintenance of the installed system through the supplier for the contracted warranty period. Report a fault to the district CREDA office rather than calling a private technician, since unauthorised repairs can void the warranty.

Is there any electricity bill after the solar pump is installed?

No. A Saur Sujala pump runs off its own solar panels and is not connected to the grid, so there is no monthly energy bill for running it.

Is Saur Sujala Yojana the same as PM-KUSUM?

No, though they overlap. Saur Sujala Yojana is Chhattisgarh's own state programme run by CREDA, while PM-KUSUM is the central solar pump scheme. CREDA implements both in the state, and a farmer normally receives a pump under only one of them.

See all Chhattisgarh Energy and Petrochemicals Department schemes →

Official forms & downloads

Links to official government PDFs and portals for this scheme.

📄
Search "Saur Sujala Yojana" on myScheme

Official government portal — click to visit

pdf
Visit Official Portal ↗
📄
All Central Government Schemes

Official government portal — click to visit

pdf
Visit Official Portal ↗

Didn't find what you needed?

Browse all Chhattisgarh schemes, or the central government schemes open to every state.