Goa State Logistics and Warehousing Incentives Scheme, Subsidy on Electricity Duty, reimburses 100% of the electricity duty paid on a High Tension connection by a Cold Chain Unit in Goa, capped at Rs 5,00,000 per unit per year and claimable once a year for the most recent 12 consecutive months. Claims are filed in Annexure-IX on goaonline.gov.in.

Benefit
100% reimbursement of electricity duty paid on High Tension connections by Cold Chain Units
Maximum benefit
Rs 5,00,000 per unit per year
Last date to apply
No fixed last date announced — the Goa State Logistics and Warehousing Incentives Scheme, 2025 remains in force for 3 years from its publication in the Official Gazette on 3 October 2025
How to apply
Online through the Goa Online single-window portal, under Incentives on Logistics and Warehousing Sector

What is the electricity duty subsidy for Goa cold chain units?

Goa State Logistics and Warehousing Incentives Scheme, 2025 is a package of fiscal incentives notified by the Department of Industries, Government of Goa under Notification 3/25/2024-IND/222 dated 24 September 2025, published in the Official Gazette, Series I No. 27, on 3 October 2025. The Subsidy on Electricity Duty is one target scheme inside that package, set out at clause 13.

The subsidy does one narrow thing. A Cold Chain Unit in Goa runs compressors and chilled storage around the clock, and its power bill carries an electricity duty component levied by the state. The scheme reimburses 100% of that electricity duty, subject to a ceiling of Rs 5,00,000 per unit per year.

Key features

  • 100% of the electricity duty paid on High Tension (HT) connections procured from the state's power distribution department.
  • Cap of Rs 5,00,000 per unit per year.
  • Claimable once per year, on the most recent 12 consecutive months of duty paid.
  • Filed in the prescribed form at Annexure-IX, through the Goa Online single-window portal at goaonline.gov.in.
  • Nodal department: Directorate of Industries, Trade and Commerce (DITC).
  • Processing and disbursement to be completed within 90 days of application.

The Government of Goa launched the Goa Logistics and Warehousing Policy, 2023 on 8 June 2023 and granted industry status to the sector; the 2025 incentives scheme is the instrument that actually pays out under that policy. The scheme remains in force for three years from the date of its Gazette publication, unless extended or terminated, and the Government reserves the right to foreclose it on six months' notice.

Who is eligible and who is not eligible?

You can claim if:

  • Your entity operates a Cold Chain Unit in Goa. Clause 13.1 confines this particular reimbursement to Cold Chain Units.
  • Your connection is a High Tension connection from the state's power distribution department.
  • The entity owns a business unit in Goa and provides logistics and warehousing services in Goa.
  • The entity holds a PAN and regularly files income tax returns in the name of the legal entity.
  • The entity has been in continuous operation for at least six months after the notification of the Logistics and Warehousing Policy 2023.
  • At least 40% of employees are Goans on the payroll during the claim year.
  • The billing period falls after the notification date of the Logistics and Warehousing Policy 2023.

You cannot apply, or are not eligible, if:

  • You are an individual, household or residential consumer. This is a business incentive; there is no citizen application route.
  • Your project is a Mega Project, an investment of Rs 100 crore or more, and/or employment of 1,000 or more Goans. Mega projects are dealt with separately under tailor-made incentives through Goa-IPB, not under this scheme.
  • Your unit is not a Cold Chain Unit. A plain warehouse, truck terminal or logistics park can claim the capital, interest and stamp duty components but not this electricity duty component.
  • The duty was paid on open access power, or on residential and colony power consumption.
  • Fewer than 40% of your employees are Goan.
  • You have claimed a similar benefit under any other scheme or programme of the State or Central Government.
  • Your claim covers charges other than the electricity duty component, energy charges, demand charges, fuel surcharge and taxes are outside the scheme.

Under the scheme, a "Goan" means a person born in Goa, or holding a 15-year Residence Certificate, or holding another document of residence in Goa issued at least 15 years earlier and accepted by the Incentive Review Committee.

How much do I actually get?

Element Position under clause 13
Rate 100% of electricity duty paid
Cap Rs 5,00,000 per unit per year
Connection type High Tension only
Claim period Most recent 12 consecutive months
Frequency Once per year per entity

The cap is not the whole story. Clause 5.13 applies a second multiplier based on Goan employment:

Goan employees on payroll Share of benefit released
60% or above 100%
More than 40% but less than 60% 80%
Less than 40% Ineligible

So a Cold Chain Unit that paid Rs 4,00,000 in electricity duty over twelve months with 45% Goan staff receives 80% of Rs 4,00,000, that is Rs 3,20,000, the Annexure-IX form has a dedicated row for "Eligible % as per employment criteria" followed by "Final Eligible Amount of Reimbursement".

What documents are required?

Document Mandatory Notes
Common Application Form, Annexure-I Yes Entity, PAN, GST, employment table
Annexure-IX electricity duty form Yes Cold store details and duty paid
Power connection details Yes Must show an HT industrial connection
Original Power Release Certificate Yes Fixes the power release date
Electricity bills for the period Yes Duty component is what counts
Payment receipts for the period Yes Proof of actual payment
PAN and income tax returns Yes In the name of the legal entity
Payroll, EPF or ESI registration Yes Decides the 100% or 80% slab
CA certificate on non-duplication Yes No same claim under another scheme

Annexure-IX also asks for the cold store capacity in MT, the number and capacity of ripening chambers, the number of sorting, grading and packaging facilities, testing and certification labs, dock levellers and conveyor-based handling systems, the type of commodities stored and the area of the unit.

How to apply for the Goa electricity duty subsidy

  1. Register the entity on the Goa Online portal at www.goaonline.gov.in and obtain your business approvals through the portal. Registration on the single-window system is the precondition for every claim under the scheme.
  2. Log in and select "Incentives on Logistics and Warehousing Sector", then choose the electricity duty target scheme. Separate claims must be filed for each incentive; one form does not cover several subsidies.
  3. Fill the Common Application Form (Annexure-I) with promoter details, entity details, PAN, GST number, date of commencement of commercial operations, and the full employment table showing male, female, Goan and total headcount by skill category.
  4. Fill Annexure-IX, entering the source of power, the industrial service connection number, the category of connection (LT or HT), connected load in KVA, date of power connection, power release date, the period claimed, units consumed and the amount of electricity duty paid in rupees.
  5. Upload the supporting documents; power connection details, the original power release certificate, the electricity bills for the period and the payment receipts — along with the Annexure-I uploads such as PAN, trade licence, GST certificate, payroll copy and the CA certificate.
  6. Submit the claim and respond to any query raised by DITC on shortfalls in the form or the documents.
  7. Allow the site inspection. DITC designates an officer to inspect the unit and verify records against the checklist at Annexure-X; the inspection report must be uploaded within 48 hours and is visible in your login.
  8. Await sanction and disbursal. The file goes to the CEO of Goa-IPB for due diligence, then to the Incentive Review Committee, which meets at least twice a month and whose decision is final. The whole cycle is to be completed within 90 days.

How do I check the status of my claim?

Log in to your account on goaonline.gov.in and open the Logistics and Warehousing incentives section. Three things are visible there: any query raised by DITC on a shortfall, the inspection report uploaded by the inspecting officer, and the sanction status. Sanctioned claims are organised chronologically and disbursed in that order, so an approved claim can still wait on the fund position; clause 5.7 makes the benefits first-come, first-served subject to availability of funds in the fiscal year.

Why electricity duty claims get reduced or rejected

  • The unit is not a Cold Chain Unit. This is the most common misunderstanding; other logistics categories are simply outside clause 13.
  • The connection is LT, not HT.
  • The claim includes energy charges or taxes, when only the duty component is reimbursable.
  • Open access power or colony and residential consumption included in the claim.
  • Billing period before the Logistics and Warehousing Policy 2023 notification date.
  • More than 12 months claimed, or a period that is not the most recent 12 consecutive months.
  • A second claim in the same year, when the entitlement is once per year.
  • Goan employment below 40%, which makes the whole claim ineligible.
  • A similar benefit already availed under another state or central scheme, which the CA certificate is meant to rule out.
  • Missing power release certificate, which is asked for in the original.

What are the other components of the scheme?

The same 2025 scheme carries several other target schemes a cold chain operator can stack, each claimed separately on Goa Online:

  • Subsidy towards investment of fixed capital to 10% of fixed capital invested capped at Rs 25,00,000 per unit per year, or 15% capped at Rs 50,00,000 for projects in backward talukas or owned by women, SC or ST entrepreneurs.
  • Subsidy towards annual interest on loans to 50% of the annual interest payable on construction loans for 3 consecutive years, or 5 years for the special category.
  • Subsidy on stamp duty and registration charges to 100% of each, capped at Rs 10,00,000 each, as a one-time reimbursement.

Clause 5.11 blocks double-dipping across governments, not across the target schemes within this notification.

Where to get help

  • Directorate of Industries, Trade and Commerce (DITC), the nodal department for the scheme, which raises queries, arranges inspection and disburses funds.
  • Goa Online single-window portal, goaonline.gov.in, where every claim, query, inspection report and sanction is recorded.
  • Incentive Review Committee, chaired by the Secretary (Industries) with the Director of DITC as Member-Convener, which takes the final call on eligibility and quantum.

Two clauses are worth knowing before you argue a case. The Government may relax any or all conditions under the scheme, and any question on the interpretation of a clause, word or expression is decided by the Government, whose decision is final and binding. Both are routes for a genuinely deserving unit that falls just outside a condition.

Documents required

Common Application Form (ANNEXURE-I)
Every claimant fills the common form first, with promoter details, entity details, PAN, GST number, employment table and GST return details.
Application form for Subsidy on Electricity Duty (ANNEXURE-IX)
Carries the cold store capacity, ripening chambers, service connection number, LT/HT category, connected load and the electricity duty paid.
Details of the power connection to the Cold Chain operating unit
Listed as the first upload under Annexure-IX. The connection must be High Tension to qualify.
Original copy of the Power Release Certificate
Establishes the power release date, which decides whether the billing period falls after the Logistics and Warehousing Policy 2023 notification.
Electricity bills for the period claimed
Only the electricity duty component of the bill is reimbursed, not any other charge levied by the state power distribution department.
Payment receipts for the period claimed
Proof that the duty was actually paid over the 12 consecutive months being claimed.
PAN of the business and income tax returns
Every entity must hold a PAN and file returns in the name of the legal entity — proprietor, firm or company as the case may be.
Payroll records and EPF or ESI registration
The proportion of Goan employees on the payroll decides whether you get 100%, 80% or nothing.
Chartered Accountant certificate on non-duplication
A CA must certify that the entity has not applied for the same reimbursement under any other Government scheme.

Frequently asked questions

How much electricity duty does the Goa logistics scheme reimburse?

The scheme reimburses 100% of the electricity duty paid on High Tension electricity connections procured from the state's power distribution department, subject to a ceiling of Rs 5,00,000 per unit per year.

Who can claim the electricity duty subsidy?

Only eligible applicants operating Cold Chain Units can claim it. Clause 13.1 of the Goa State Logistics and Warehousing Incentives Scheme, 2025 restricts this particular reimbursement to Cold Chain Units, unlike the capital and interest subsidy components which cover eight project types.

Is a Low Tension connection covered?

No. The reimbursement applies to electricity duty paid on High Tension (HT) connections procured from the state's power distribution department. Annexure-IX asks you to declare the category of connection as LT or HT.

How often can a unit claim this subsidy?

Each entity is entitled to benefit from this scheme once per year, and the claim is restricted to the total electricity duty paid over the most recent 12 consecutive months.

Is open access power eligible?

No. Electricity duty paid for residential and colony power consumption, and for open access power, is expressly excluded from reimbursement under the scheme.

Can an individual apply for this subsidy?

No. This is an industry incentive, not a personal benefit. The applicant must be a registered legal entity owning a Cold Chain Unit in Goa with a PAN and filed income tax returns; households and individual electricity consumers cannot apply.

How long does the claim take to be processed?

The Directorate of Industries, Trade and Commerce is required to complete processing and disbursement within a maximum of 90 days from the date the application is received.

What happens if fewer than 40% of employees are Goan?

The claim is ineligible. Under clause 5.13, an entity with 60% or more Goan employees on the payroll gets 100% of the benefit, one with more than 40% but less than 60% gets 80%, and one below 40% gets nothing.

See all Goa Industries and Mines Department schemes →

Official forms & downloads

Links to official government PDFs and portals for this scheme.

📄
Search "Goa State Logistics and Warehousing Incentives Scheme: Subsidy on Electricity Duty" on myScheme

Official government portal — click to visit

pdf
Visit Official Portal ↗
📄
All Central Government Schemes

Official government portal — click to visit

pdf
Visit Official Portal ↗

Didn't find what you needed?

Browse all Goa schemes, or the central government schemes open to every state.