Quick answer

The Revised Modified High Density Plantation Scheme of Jammu and Kashmir gives orchardists a flat 50 per cent subsidy on the full worked-out cost of setting up a high-density orchard in 12 fruit crops, worth up to Rs 19.69 lakh per hectare for apple. Orchardists holding 1 to 40 kanals apply to their Chief Horticulture Officer.

Apply on the official portal Helpline: 0191-2505781
Benefit
Flat 50 per cent subsidy on the total worked-out per-hectare project cost across 12 fruit crops, released in two instalments of 80 per cent and 20 per cent after joint inspection
Maximum benefit
Rs 19.69 lakh per hectare (apple)
Last date to apply
Scheme period 2022-23 to 2026-27; applications are called district-wise each planting season against annual targets
How to apply
Offline application in the prescribed format to the Chief Horticulture Officer of the district, with online farmer registration on the HADP Kisan Sathi portal
Helpline
0191-2505781

What is the High Density Plantation Scheme in Jammu and Kashmir?

The Revised Modified High Density Plantation Scheme is a 100 per cent Union Territory funded scheme of the Agriculture Production Department, Government of Jammu and Kashmir, implemented on the ground by the Department of Horticulture through the Directorates of Horticulture at Kashmir and Jammu. The scheme was sanctioned by Government Order No. 176-JK (APD) of 2022 dated December 2022, following Administrative Council Decision No. 161/14/2022 dated 19 December 2022.

High density plantation, often written locally as the HDP scheme, replaces the traditional widely spaced orchard with a far denser planting on dwarfing rootstock, supported by a trellis system, micro-irrigation and an anti-hail net. An apple orchard under the scheme carries 3,333 plants per hectare on M-9 rootstock, against a few hundred in a traditional orchard. The result is that the orchard begins bearing in roughly the third or fourth year instead of the seventh or eighth, and yields far more fruit from the same land.

According to the Government Order, the stated objective is enhanced production and productivity and raising the income of farmers. The scheme covers 5,500 hectares over five years, from 2022-23 to 2026-27.

Key features

  • Flat 50 per cent overall subsidy on the total worked-out cost, deliberately fixed without specifying the components, so the orchardist is not tied to a rigid component-wise ceiling.
  • Twelve fruit crops covered, apple, pear, cherry, olive, kiwi, mango, litchi, citrus, guava, dragon fruit, almond and walnut.
  • Qualifying orchard area of a minimum 1 kanal and a maximum 40 kanals.
  • Planting material, trellis, micro-irrigation and anti-hail net are supplied and installed by a departmentally empanelled Private Enterprise, chosen by the farmer from a list of service providers.
  • Subsidy released against Joint Inspection Team reports, tied to a survival rate above 90 per cent.

Who is eligible for the High Density Plantation Scheme?

You can be selected if:

  • You are an orchardist or land-owning farmer in the Union Territory of Jammu and Kashmir.
  • Your qualifying orchard area is at least 1 kanal and not more than 40 kanals.
  • You hold revenue records proving ownership of that land.
  • Your land is found feasible for high density plantation on inspection by the Horticulture Development Officer and the Chief Horticulture Officer.
  • You choose one of the 12 notified fruit crops and a Private Enterprise from the department's list of service providers.
  • You are willing to deposit your own equity share with the designated bank, and to furnish collateral if you take the optional loan.

You are not eligible, or your application cannot be approved, if:

  • Your holding is below 1 kanal of qualifying orchard area.
  • Your land is assessed as non-feasible for high density plantation. The Government Order requires the Chief Horticulture Officer to reject such applications with valid reasons recorded, which means you are entitled to know why.
  • You want a crop outside the 12 notified fruits.
  • The district target for the year is already exhausted. Targets are allotted district-wise on the basis of budget allocation, so a valid application may simply be carried to the next season rather than refused on merit.

The Government Order also notes that orchardists who wish to set up high density orchards entirely on their own in the private sector may do so outside the ambit of the scheme, and that orchardists seeking other MIDH components such as creation of a water source, a pack house or machinery should be given preference.

How much money does the scheme give per hectare?

The subsidy is 50 per cent of the worked-out cost for the crop, so it varies sharply by crop because a trellised apple orchard costs many times more than a mango orchard. According to the per-hectare budget in the Government Order:

Fruit crop Plants per hectare Worked-out cost (Rs lakh/ha) Subsidy at 50% (Rs lakh/ha) Farmer's share (Rs lakh/ha)
Apple 3,333 39.38 19.69 19.69
Cherry 2,222 36.79 18.40 18.40
Pear 2,222 32.34 16.17 16.17
Kiwi 833 24.54 12.27 12.27
Dragon fruit 1,111 21.68 10.84 10.84
Olive 1,111 9.24 4.62 4.62
Almond 625 8.34 4.17 4.17
Walnut 277 5.41 2.705 2.705
Guava 833 5.01 2.505 2.505
Mango 500 4.16 2.08 2.08
Citrus 500 4.16 2.08 2.08
Litchi 400 4.08 2.04 2.04

The per-hectare budget covers the cost of plants, the trellis system, micro irrigation, the anti-hail net, land development, pit digging, vermicompost, plant protection chemicals and integrated nutrient and pest management. Because the subsidy is fixed as an overall 50 per cent rather than component by component, an orchardist who spends more on one head and less on another is not penalised.

Most holdings in Jammu and Kashmir are far smaller than a hectare, and the benefit is worked out pro rata. One kanal is one-eighth of an acre, so 8 kanals make an acre and roughly 20 kanals make a hectare. An apple orchardist planting 10 kanals is therefore looking at roughly half the per-hectare figures above.

What crops, rootstocks and plant specifications are prescribed?

The Government Order fixes the rootstock and the plant specification for each crop so that farmers are not sold inferior material. Apple must be on M-9 rootstock, two years old, with five or more feathers and a height of four feet and above. Pear is on Quince BA-29C or Quince C at five feet height with five or more feathers, cherry on Gisela 3 or Gisela 5 at five feet height, walnut on Juglans regia at three feet and above, and almond on Garnem or GF 677. Olive, kiwi, mango, litchi, citrus, guava and dragon fruit have their own listed varieties and specifications.

Approved apple varieties include Super Chief Sandidge, Red Chief Campspur, Red Velox, Oregon Spur, Silver Spur, Starkrimson, Gala Redlum, Gala Buckeye, Gala Brookfield, Fuji Zhen Aztec, Fuji Kiku, Granny Smith, Golden Delicious Reindeer and Golden Delicious Clone-B. Walnut varieties include Chandler, Fernor, Maras 12, Fernette and Franquette.

The Private Enterprise is responsible for importing the planting material of the recommended varieties strictly as per the Plant Protection and Quarantine Order, 2003, keeping it in a post-entry quarantine facility, and facilitating inspection by the Designated Committee.

How to apply for the High Density Plantation Scheme in J&K

  1. Register as a farmer on the HADP Kisan Sathi portal at hadp.jk.gov.in, the common Agriculture Production Department platform through which J&K farm scheme applications and grievances are handled.
  2. Visit the office of your Chief Horticulture Officer and obtain the prescribed application format for high density plantation. The department calls applications from orchardists district-wise against the annual target.
  3. Fill the application specifying the fruit crop you want to plant and your preference of Private Enterprise from the department's list of service providers.
  4. Attach your land ownership proof. The revenue record for the qualifying orchard area, and submit the application to the Chief Horticulture Officer.
  5. Wait for the feasibility check. The Horticulture Development Officer inspects the land. The Chief Horticulture Officer finalises the list after confirming both that the land is feasible and that your chosen Private Enterprise actually has the planting material. If the material is unavailable, you are offered a choice of other enterprises.
  6. Have the Detailed Project Report prepared. The Chief Horticulture Officer draws up the DPR in consultation with you, the Private Enterprise and the bank, covering crop and varieties, trellis, micro-irrigation, anti-hail net, specifications, your share, the loan amount, the subsidy and the completion timeline. Sign it and keep your copy.
  7. Deposit your equity with the designated bank branch, and furnish collateral to the extent of the loan if you are borrowing.
  8. Complete land preparation: fencing, water source creation and land suitability work — before plantation, and let the Private Enterprise install the trellis, micro-irrigation and anti-hail systems.
  9. Attend and sign the Joint Inspections when they are held, and keep the copies of the inspection reports.

How is the subsidy paid and inspected?

The Joint Inspection Team is constituted with the concerned Chief Horticulture Officer, an Agriculture Engineer, the concerned Horticulture Development Officer, a representative of the financial institution, the farmer and the Private Enterprise. Two inspections govern the money.

The first joint inspection is conducted within 15 days of the Private Enterprise applying, once the trellis, micro-irrigation, anti-hail system and plantation are complete and the plants sprout. If the systems are satisfactorily installed and the survival rate exceeds 90 per cent, the team recommends release of 80 per cent of the assistance. The report goes to the bank in the district within five days of inspection, and the bank must release payment within 10 days of receiving it. If the survival rate is below 90 per cent, the deficiencies are pointed out to the Private Enterprise, which must make them good and then apply afresh.

The second joint inspection is conducted within 15 days of the enterprise applying, when the plantation comes into bearing and the plants prove true to type. The team recommends the remaining 20 per cent within five days, and the financial institution releases it within 15 days.

For fruit crops that need no trellis and no anti-hail net, the first inspection is held after plantation and sprouting and the second when the plants bear and prove true to type, with the same 80:20 split.

A copy of every joint inspection report is also furnished to the Director Horticulture concerned, which gives you a second place to follow up if a payment stalls.

What are your responsibilities as the orchardist?

The Government Order sets out the farmer's obligations explicitly, and failing them is the commonest reason an otherwise sanctioned case runs into trouble:

  • Submit the application with land ownership proof, crop preference and Private Enterprise preference.
  • Complete land preparation, fencing, water source creation and land suitability work before plantation.
  • Deposit your equity share with the bank as per the approved DPR, and provide collateral for the loan component if availed.
  • Take responsibility for periodic maintenance of the orchard. Survival below 90 per cent at first inspection holds up 80 per cent of the money.
  • Undergo training and attend awareness camps organised by the Horticulture Department with the other stakeholders.
  • Give periodic feedback on project status to the Chief Horticulture Officer and the financial institution.
  • Repay the term loan regularly after the moratorium, from the fourth year, if a loan was taken.
  • Sign the joint inspection reports along with allied documents at the time of inspection, since the subsidy release depends on them.

Why applications get rejected or delayed

  • Land found non-feasible for high density plantation on physical verification. This is the primary rejection ground and must be recorded with reasons.
  • Holding below 1 kanal, or an area claim beyond the 40 kanal cap.
  • District target exhausted for the financial year against the budget allocation.
  • Planting material not available with the chosen Private Enterprise, which delays rather than kills the case, since you can switch to another enterprise.
  • Survival rate below 90 per cent at first joint inspection, which holds the 80 per cent release until the enterprise makes good the deficiency.
  • Plants not true to type at second inspection, which puts the final 20 per cent at risk and exposes the enterprise to blacklisting.

Where to get help and lodge a grievance

  • HADP Kisan Sathi portal, hadp.jk.gov.in; carries a Lodge Grievance and Grievance Status facility for Agriculture Production Department schemes, a Credit Scheme Advisor at csa.jk.gov.in, and a DPR Generator at dpr.hadp.in.
  • Kisan Khidmat Ghar (KKG) app on Android and iOS for expert support.
  • Chief Horticulture Officer of your district. The first and most important point of contact, since the application, the feasibility report, the DPR, the work order and the joint inspection all run through this office.
  • Directorate of Horticulture, Jammu, Gole Pully, Talab Tillo, Jammu, phone 0191-2505781, fax 0191-2501219, website hortijmu.jk.gov.in.
  • Directorate of Horticulture, Kashmir for districts in the Kashmir division.

No agent can secure a place under this scheme for you. Selection runs through the Chief Horticulture Officer against a published district target, and the money never passes through a middleman, it goes from the bank to the Private Enterprise against a signed joint inspection report.

Documents required

Application in the prescribed format
Obtained from the office of the concerned Chief Horticulture Officer. The form must state the fruit crop chosen and the preferred Private Enterprise (service provider) from the department's list.
Land ownership proof (revenue record)
Girdawari, jamabandi or equivalent revenue record showing the qualifying orchard area in the applicant's name. Minimum 1 kanal, maximum 40 kanals.
Bank account details
The subsidy and any loan are routed through the designated bank branch where the beneficiary maintains the account. J&K Bank or any other financial institution willing to lend may be used.
Aadhaar card
Used for farmer registration on the HADP Kisan Sathi portal and for identification during joint inspection.
Detailed Project Report signed by all stakeholders
Prepared by the Chief Horticulture Officer in consultation with the orchardist, the Private Enterprise and the bank. Not something the farmer prepares alone.
Loan sanction or equity deposit proofoptional
Needed only where the orchardist chooses to finance the remaining 50 per cent through a bank loan. Taking a loan is optional under the scheme.

Frequently asked questions

How much subsidy does the J&K High Density Plantation Scheme give?

The scheme gives a flat 50 per cent subsidy on the total worked-out project cost, with no component-wise restriction, across all 12 notified fruit crops. For apple the worked-out cost is Rs 39.38 lakh per hectare, so the subsidy is Rs 19.69 lakh per hectare and the orchardist bears the matching Rs 19.69 lakh. For cherry it is Rs 18.40 lakh, for pear Rs 16.17 lakh and for kiwi Rs 12.27 lakh per hectare.

What is the minimum land needed for the High Density Plantation Scheme in J&K?

The qualifying orchard area is a minimum of 1 kanal and a maximum of 40 kanals per beneficiary, as set out in the Government Order of December 2022. An orchardist with less than 1 kanal of suitable land is not eligible, and area beyond 40 kanals has to be developed outside the scheme.

Which fruit crops are covered under the J&K High Density Plantation Scheme?

Twelve fruit crops are covered — apple, pear, cherry, olive, kiwi, mango, litchi, citrus, guava, dragon fruit, almond and walnut. The scheme targets 5,500 hectares over five years, of which apple alone accounts for 2,400 hectares and citrus 1,100 hectares.

Do I have to take a bank loan to join the scheme?

No, the loan is optional. The Government Order records the financing pattern as subsidy assistance as per the crop-wise per-hectare budget, with the rest of the project cost financed 80 per cent by a financial institution and 20 per cent borne by the farmer, but it also lists the bank route as optional. An orchardist who can fund the balance from own resources may do so.

How is the subsidy released under the High Density Plantation Scheme?

The subsidy is released in two instalments against Joint Inspection Team reports, not paid upfront. The first joint inspection is held after the trellis, micro-irrigation, anti-hail system and plantation are complete and the plants sprout, and on a survival rate above 90 per cent the team recommends release of 80 per cent. The remaining 20 per cent follows the second inspection when the plants bear and prove true to type.

What happens if the plants do not prove true to type?

The Private Enterprise that supplied the planting material must replace it free of cost and pay the loss as assessed by the Horticulture Department. If the enterprise fails to do so, the balance 20 per cent of its payment is forfeited and the enterprise is blacklisted. This protection sits with the supplier, not with the farmer.

When does loan repayment start if I avail finance?

Repayment starts from the fourth year onward, with capitalisation of interest for the first three years, which matches the period before a high density orchard begins bearing commercially. An orchardist who prefers to repay earlier faces no bar. The rate of interest is whatever the lender's agriculture sector structure prescribes.

Who cannot get the benefit of this scheme?

An applicant whose land is found non-feasible on inspection cannot get the benefit, and the Chief Horticulture Officer must reject such an application with valid reasons recorded. Applicants with less than 1 kanal of qualifying area are also not eligible, and applications beyond the district's annual target for the year cannot be sanctioned in that year.

See all Jammu and Kashmir Agriculture, Farmers Welfare and Co-operation Department schemes →

Official forms & downloads

Links to official government PDFs and portals for this scheme.

📄
Search "Revised Modified High Density Plantation Scheme, Jammu and Kashmir" on myScheme

Official government portal — click to visit

pdf
Visit Official Portal ↗
📄
All Central Government Schemes

Official government portal — click to visit

pdf
Visit Official Portal ↗

Didn't find what you needed?

Browse all Jammu and Kashmir schemes, or the central government schemes open to every state.