Promotion of Energy Audit and Conservation of Energy (PEACE): Incentive for Implementing Energy Audit Recommendations
Tamil Nadu state government scheme
This PEACE component of the Tamil Nadu MSME Department subsidises 50 per cent of the cost of equipment and technology adopted to implement energy audit recommendations, up to Rs 10,00,000, for manufacturing MSMEs that achieve at least 10 per cent energy savings per unit of product. The claim is filed online after 3 months.
What is the PEACE implementation incentive?
The Incentive for Implementing Energy Audit Recommendations is the second money component of the Promotion of Energy Audit and Conservation of Energy (PEACE) scheme run by the Micro, Small and Medium Enterprises Department, Government of Tamil Nadu. Where the first component pays for the audit, this one pays for acting on it.
According to the MSME Policy 2021 guidelines approved in G.O. (Ms) No. 37, MSME Department, dated 6 July 2021, the subsidy is 50 per cent of the cost of the eligible components, subject to a maximum of Rs 10,00,000, for manufacturing MSMEs that have undertaken an energy audit and achieved at least 10 per cent energy savings in units of energy consumed per unit of product manufactured, measured against the last 12 months' average.
An older page still hosted on the MSME portal describes the earlier terms to 25 per cent of the cost of eligible components subject to a maximum of Rs 2,00,000, with a 15 per cent savings threshold. The 2021 order supersedes all earlier orders on subsidies, so the 2021 figures are the ones to plan against, with the District Industries Centre confirming the rate applicable to a particular implementation date.
The objective stated in the guidelines is to incentivise MSMEs to implement the recommendations of the energy audit report and to optimise energy consumption, leading to energy saving and money saving in electricity bills.
Who is eligible for the implementation incentive?
Your enterprise can apply if:
- It is a manufacturing MSME in Tamil Nadu.
- It has undertaken an energy audit by a BEE-accredited auditor or a BEE-empanelled audit firm.
- It has achieved at least 10 per cent energy savings in terms of the number of units of energy consumed per unit of product manufactured, with reference to the last 12 months' average.
- The investment was made after the energy audit, not before it.
- The claim is filed in the permitted window; after three months from implementation and within one year of implementation or two years from the audit, whichever is earlier.
Your enterprise is not eligible if:
- It is a micro, small or medium service enterprise. Service enterprises are expressly listed as ineligible for this component.
- It has availed a similar subsidy for the same purpose from any other State or Central Government department or agency.
- The savings threshold is not met or cannot be certified by the energy auditor.
- The equipment was bought before the audit. Pre-audit investment does not qualify, however energy-efficient it is.
- The claim is filed before three months from implementation, or after the outer limit.
What costs are eligible?
| Eligible component | Covered |
|---|---|
| Cost of technology acquired for energy saving | Yes |
| Cost of replacement of equipment for energy conservation | Yes |
| Cost of machinery and accessories newly purchased and installed for the purpose | Yes |
| Cost of modification, alteration or retrofit of existing machinery or equipment for energy conservation | Yes |
| Investments made before the energy audit | No |
| Subsidy rate (2021 guidelines) | 50 per cent |
| Ceiling (2021 guidelines) | Rs 10,00,000 |
Because the ceiling under the current guidelines is Rs 10 lakh, this is one of the larger single incentives available to a Tamil Nadu MSME, and it rewards a genuinely engineering-led exercise: replacing an oversized motor, retrofitting variable frequency drives, insulating a steam line, or moving to a more efficient compressor after the audit has quantified the loss.
How the 10 per cent saving is measured
The guidelines set out the measurement method precisely, and applicants should set up their records to match it from day one:
- The metric is specific energy consumption: kWh or kcal per unit of product manufactured, not total consumption. A unit that grows its output must still show the ratio falling.
- The baseline is the twelve-month average energy consumption before the implementation of the energy audit recommendation.
- The post-implementation figure is a minimum three-month average after implementation.
- The energy auditor certifies the implementation and the quantum of energy savings.
This is exactly why the application cannot be filed earlier than three months after implementation, the three-month average has to exist before the claim can be made.
How to apply for the PEACE implementation incentive
- Complete the detailed energy audit first and keep the report, which fixes the audit date for the outer time limit.
- Implement the recommendations; acquire the technology, replace or retrofit the equipment, and record the date of implementation.
- Run the plant for at least three months after implementation so that the post-implementation average energy consumption can be computed.
- Get the energy auditor's certificate of implementation and of the quantum of energy savings achieved, showing that the saving is at least 10 per cent in specific energy consumption.
- Assemble the expenditure record, cash bills, invoices and stamped receipts, duly attested. Where receipts are unavailable, furnish the bank scroll showing the payments with details of the machinery supplied, in original, attested by the bank manager.
- Log in to msmeonline.tn.gov.in, open the Incentives section, select the PEACE; Implementation component and apply in the prescribed format-II to the General Manager, District Industries Centre, or the Regional Joint Director, Chennai.
- Upload the documents as PDFs of not more than 200 KB each and submit within the window, after three months from implementation, and within one year of implementation or two years of the audit, whichever is earlier.
- Produce originals at inspection when the department verifies the installation at the premises.
How the subsidy is released
- The subsidy is released to the MSME after implementation of the recommendations in the energy audit report, duly certified by the energy auditor.
- Where the unit availed a loan to implement the recommendations, the subsidy is released to the bank to be adjusted in the loan account if the loan is still current.
- Enterprises with more than one unit may avail the concession separately for each unit.
Why implementation claims are rejected
- Savings below the threshold, or savings that the auditor will not certify.
- Filing too early, before the three-month post-implementation period is complete, or too late, after the one-year or two-year outer limit.
- Equipment purchased before the audit, which is excluded by rule.
- Service enterprise applying for a component restricted to manufacturing.
- Same subsidy already drawn from another State or Central agency for the same equipment.
- Receipts missing without the alternative bank scroll attested by the bank manager.
- Measurement on total consumption instead of specific energy consumption per unit of product, which usually produces a figure the department will not accept.
Key dates
- Date of the energy audit — starts the two-year outer limit.
- Date of implementation of the recommendations, starts both the three-month waiting period and the one-year limit.
- Three months after implementation, the earliest date to file.
- One year from implementation, or two years from the audit, whichever is earlier. The last date to file.
The "whichever is earlier" phrase catches units that let a year drift between the audit and the implementation. If the audit was done in January 2026 and the equipment installed in December 2026, the outer limit is January 2028 from the audit rather than December 2027 from implementation, but if implementation slips to June 2027, the two-year audit limit expires first and the claim is lost. Implement promptly after the audit.
Help and grievance route
- General Manager, District Industries Centre of your district. The office the format-II application is addressed to.
- Regional Joint Director of Industries and Commerce, Chennai, for Chennai district enterprises.
- msmeonline.tn.gov.in, Know Your Eligibility, List of Documents, Track Your Status and the entrepreneur Grievance login.
- Bureau of Energy Efficiency: to confirm an auditor's accreditation before engagement, since an uncertified auditor breaks both PEACE claims.
No fee is charged to file the claim. The department's published dos and don'ts warn enterprises not to enter false data and not to file by hiding a benefit already availed under another government scheme.
How to check your application status
- Go to msmeonline.tn.gov.in, the same portal used to file the format-II claim for PEACE implementation.
- Log in with the credentials used at the time of application, the entrepreneur login created for the incentives module.
- Open the Track Your Status option listed on the portal alongside Know Your Eligibility and List of Documents.
- Select the PEACE, Implementation component and the specific application reference to see its current stage: received, under scrutiny at the District Industries Centre (or the Regional Joint Director's office for Chennai applicants), inspection pending, inspection completed, or sanctioned.
- If the portal shows no movement for an extended period after the inspection stage, follow up directly with the General Manager, District Industries Centre of the district where the unit is registered, since that office holds the physical file and schedules the site verification.
- Chennai district units should route the follow-up to the Regional Joint Director of Industries and Commerce, Chennai instead of a District Industries Centre.
- If the claim appears stuck for reasons unrelated to normal processing time, such as a document query that was never resolved or an inspection that was never scheduled, use the entrepreneur Grievance login on the same msmeonline.tn.gov.in portal to record the complaint against the application reference number.
- Keep the acknowledgement generated at the time of filing on msmeonline.tn.gov.in on hand for every status check or follow-up call, since the department indexes files by that reference number rather than by the applicant's name.
Because the subsidy is released only after the site inspection confirms the installation, most of the waiting time in a PEACE implementation claim sits between document scrutiny and inspection scheduling. A status check that has stayed at "under scrutiny" well beyond a few weeks is the point at which a direct call or a portal grievance to the District Industries Centre is worth making, rather than waiting further on the online status alone.
Documents required
Frequently asked questions
How much subsidy is given for implementing energy audit recommendations?
Under the MSME Policy 2021 guidelines the subsidy is 50 per cent of the cost of the eligible components, subject to a maximum of Rs 10,00,000. An older page on the MSME portal still quotes the earlier rate of 25 per cent up to Rs 2,00,000.
How much energy saving must be proved?
At least 10 per cent savings in terms of units of energy consumed per unit of product manufactured, measured against the last 12 months' average, under the 2021 guidelines. The older portal guidance required 15 per cent.
How is the saving measured?
The percentage saving in specific energy consumption, in kWh or kcal per unit of product, is reckoned on the twelve-month average energy consumption before implementation against a minimum three-month average after implementation.
When exactly can I apply?
Only after three months from the date of implementation of the energy audit recommendations, and no later than one year from implementation or two years from the date of the energy audit, whichever is earlier.
What costs are eligible?
The cost of technology acquired for energy saving, the cost of replacing equipment or of machinery and accessories newly purchased and installed for energy conservation, and the cost of modification, alteration or retrofit of existing machinery for energy conservation.
Does investment made before the audit count?
No. The guidelines state that only investments made after the energy audit are eligible for the subsidy.
Can service enterprises apply?
No. All micro, small and medium service enterprises are listed as ineligible, as are manufacturing MSMEs that have availed a similar subsidy for the same purpose from any other State or Central Government department or agency.
See all Tamil Nadu Small and Medium Enterprises Department schemes →
Schemes in other states
Official forms & downloads
Links to official government PDFs and portals for this scheme.
Official government portal — click to visit
Didn't find what you needed?
Browse all Tamil Nadu schemes, or the central government schemes open to every state.